The Promontory Lodge — large mountain estate

Case study · Promontory · Park City

The Promontory Lodge

A 9,200 sq ft multi-generational family compound on a 4.7-acre Promontory parcel. Seven bedrooms, separate guest wing, indoor sport court, AIA Mountain West merit award.

The build

A mountain contemporary home in Promontory · Park City.

The Promontory Lodge was conceived as a generational home — a Park City address for three generations of one family, designed so the kids and grandparents could share holiday weeks without sharing walls. The owners came to us with a clear program brief on the first call: seven bedrooms, separate guest wing accessible without crossing the main living spaces, indoor recreation that worked in February, and a kitchen sized to host fifteen at Thanksgiving.

Architect Owen Alder organized the home as two intersecting bars connected by a central kitchen-living spine. The east bar carries the primary suite, two guest suites, and the children's wing; the west bar runs the indoor sport court and walks out to a finished basement with a 2,000-bottle wine cellar and a billiards-and-bar room. The separate guest wing — a 1,800 sq ft two-bedroom flat over the four-car garage — has its own exterior entrance off the motor court, its own kitchen, and full independent climate control.

The home earned an AIA Mountain West merit award in 2023 and a Utah Style & Design Home of the Year feature in 2024. It also became the reference build the firm uses for any multi-generational program brief; we've since delivered three more homes that drew directly from this floor plan and four others that adapted the guest-wing strategy.

Floor plan + massing

How the home is organized.

Two intersecting bars at a courtyard-defining angle. East bar (main house): primary suite at the south end, three secondary bedrooms in a children's wing at the north end, separated by a central kitchen-great-room spine. West bar: indoor sport court (full-court, 16-ft ceiling), opening to a finished walkout basement with wine cellar, billiards, bar, and home theater. Guest wing: detached 1,800 sq ft two-bedroom flat over the four-car heated garage, accessed via the motor court. Outdoor program: 1,200 sq ft south-facing deck with outdoor kitchen, fire pit, and hot tub; full landscape design extends to the perimeter of the building envelope.

The Promontory Lodge — main house exterior, courtyard-defining angle
The Promontory Lodge — open kitchen with Calacatta Borghini island
The Promontory Lodge — main living room with stone fireplace

Finish-out specifications

What's in the actual spec book.

Sierra Pacific wood-clad windows, custom black-on-mahogany
Heart-grain Western Red Cedar siding, vertical channel
Telluride Gold dimensional stone, full wrap on chimneys
Standing-seam Galvalume roof, 24-gauge
Wide-plank reclaimed walnut floors, 8" face
Sub-Zero / Wolf / Cove appliance package, full kitchen
Calacatta Borghini island, 14-foot single slab
Custom rift-oak cabinetry, hand-built site shop
Lutron RadioRA whole-home lighting + Shades
Crestron AV + integrated security commissioning
Spray-foam wall + roof, R-49 ceiling, R-23 walls
Two-stage gas-furnace HVAC with whole-home humidification
Sport court — full-court hardwood, six-bulb LED, lift-fan
Wine cellar — 2,000-bottle dual-zone, mahogany racking
Home theater — 12-seat, Dolby Atmos, 130" Stewart screen
Outdoor kitchen — Wolf grill, dual side burners, ice maker

Build timeline

How the 22 months sign to keys broke down.

Discovery + program
Weeks 1–5
Two-day program brief; three-generation seating plan and use-case study.
Schematic design
Months 1–3
Two intersecting bars scheme adopted; first DRC working session.
Design development
Months 3–6
Guest wing program finalized; sport-court engineering; FFE schedule.
DRC + permitting
Months 6–8
First-pass DRC approval; building permit; one engineering revision on retaining.
Foundation + framing
Months 8–14
Full poured walkout foundation; engineered I-joist framing; sport-court envelope.
Mechanical + envelope
Months 14–18
Cedar siding install; window install; mechanical rough-in.
Finishes + commissioning
Months 18–21
Cabinetry install; theater + AV commissioning; wine-cellar install.
Punch + hand-off
Months 21–22
Punch list; mechanical training; pre-occupancy DRC final; certificate of occupancy.

We had a complicated lot, an HOA that was making it harder, and a brief that asked the architect to seat fifteen people for Thanksgiving and still leave room for the grandkids' Lego project. Alder & Stone walked us through what could be permitted, what couldn't, and saved us from spending eighteen months on a design that would never pass.

J. Mendel, Promontory · September 2022

Back to all featured builds →

Tell us about your project

Building something like this?

Send the program and the lot — we'll be candid about whether the timeline above is realistic for your project, and what would shift the price up or down.